Coalinga Wastewater Treatment Plant
DRAFT Environmental Impact Report

July 15, 2005

Comments on the Draft EIR must be submitted in writing
by 5:00 p.m. August 29, 2005, to:

Mr. Bill Skinner
c/o Mary B. Reents
Morro Group, Inc.
1422 Monterey Street, Suite C200
San Luis Obispo, CA 93401

Please note: The files on this site require Adobe Acrobat Reader.
Please download from http://www.adobe.com/acrobat


Links to the Draft EIR:

Note that Figures not included in text sections
are available in the Figures section.

REVIEWER’S GUIDE

CHAPTERS:

0. Table of Contents
I. Introduction
II. Summary
III. Project Description
IV. Environmental Setting
V. Impacts and Mitigation
VI. Alternatives
VII. Environmental Analysis
VIII. Mitigation, Monitoring and Reporting Program
IX. References

FIGURES:

FigIII-2 Project Location
FigIII-7 WWTP Site Plan
FigIII-8 Collection System
FigIV-2 Project Topo
FigIV-3 Setting Aerial
FigV F-1 Plant Communities
FigIV-1 Alternative Sites
FigVI-2 Trunk Line Alternatives

APPENDIX SECTIONS:

App -- Table of Contents
App A NOP
App B NOP Responses
App C RWQCB Orders
App D Air Space Plan
App E Erosion-Sedimentation
App F LESA Forms
App G BRSR
App H CHCP Landcover
App I Higgins traffic report
App J Noise